Hi All, the next ‘Recovery Ride’ is planned for Sat 10/17. Well keep it simple and do the same 2 part route again. I hope you’ll consider joining us. = Recovery Ride = 9:00 am meetup at Rockridge BART 9:30 rollout This will be a fun, party-pace (easy), no drop ride with planned food and bathroom stops. Will start with some fun intros, stretches, talk thru group cycling basics (hand signals, group ride etiquette, pick a sweep rider). + Route(s) + Easy Does It – First segment 5.0 miles, almost flat, past a few cute local parks, ends at Cafe (Starter Bakery). One hill at a time – Second segment 12 miles, 1,350 ft climbing Classic Tunnel, Skyline, Claremont loop end at Cactus Taqueria or somewhere with outdoor seating and space for bikes.
https://ridewithgps.com/routes/56024941?privacy_code=iV0C3sMIAkckVLgDXI69EZTaPRJImU5n
https://ridewithgps.com/routes/42478535?privacy_code=lr4Cjxtb6itQSiRq
Please reach out to Patch for any more info. 805-390-8493. or [email protected]
