All Al anon and AA welcome. There are two segments… first one is an easy flat ride. Afterwards for those interested, there is a more challenging ride with some hills.
Here’s a detailed ride plan for the ‘Recovery Ride’ on Sat 7/25
= Recovery Ride =
9:00 am meetup at Rockridge BART
9:30 rollout
This will be a fun, party-pace (easy), no drop ride with planned food and bathroom stops. Will start with some fun intros, stretches, talk thru group cycling basics (hand signals, group ride etiquette, pick a sweep rider).
+ Route(s) +
Easy Does It – First segment
5.0 miles, almost flat, past a few cute local parks, ends at Cafe (Starter Bakery).
One hill at a time – Second segment
12 miles, 1,350 ft climbing
Classic Tunnel, Skyline, Claremont loop end at Cactus Taqueria or somewhere with outdoor seating and space for bikes.
https://ridewithgps.com/routes/56024941?privacy_code=iV0C3sMIAkckVLgDXI69EZTaPRJImU5n
https://ridewithgps.com/routes/42478535?privacy_code=lr4Cjxtb6itQSiRq
For further info please contact Patch 805-390-8493
